A successful project begins with establishing the boundary conditions. Which requirements must the project meet? When must it be commissioned? And at what it costs? In addition to the specific approach of the project, these matters also determine its duration and the number of people that will be involved. In addition, the standards on which the entire engineering is based are of great importance. Therefore, these standards are fine-tuned with the client before the work begins.
Phased project approach
In our methodology, each project is described by means of a number of drawings and documents that have to be submitted at the end of the path. Moreover, each drawing and document belongs to a specific phase of the project. The project cannot transition to a next phase before the current phase has been satisfactorily completed.
Standard documents
We support our phased project approach with the use of a number of standard documents. For instance, drawing register, query lists, standards for use of mouldings, conduit dimensions, etc.
Software
We are proficient in the use of, for instance, the following software packages: